April 25, 2024

MQ-4C Triton Arrives at Pax

An MQ-4C Triton Unmanned Aircraft System (UAS) arrived at NAS Pax River with 2 more expected in the next few weeks.

X-47B UCAS Completes Testing

The Navy’s X-47B UCAS completed its final test aboard the USS Theodore Roosevelt and returned to its home base at NAS Pax River after eight days at sea.

Canada Wavering on F-35 Buy

If Canada doesn’t join the F-35 JSF program it may negatively affect the long-term affordability of the F-35 for all participants.

Innovate Within Contracting System

While waiting for Congressional acquisition reform, experts believe there’s a lot of freedom to innovate within the existing federal contracting system.

K-MAX Crash Details

A report determined that the crash was preventable and occurred because the K-MAX pilots did not react quickly enough when it experienced unexpected wind.

Mechanical Failure Downs Global Hawk

Navy investigators conclude that a mechanical failure, not the crew’s actions, caused a NAS Pax River Global Hawk UAV to crash on the Eastern Shore in 2012.

Morning Coffee: UCLASS RFP Details and Analysis

Potential Boeing UCLASS

The draft RFP is designed to generate industry input on design, development, construction and deployment.

Morning Coffee: NAVAIR Head Seeks Contracting Reform

Vice Adm. David A. Dunaway

Vice Adm. Dunaway says overhead costs overwhelm the implementation of new technology and that there is a “stranglehold” of proprietary systems.

Morning Coffee: Hoyer Supports Wind Farm Limits

Hoyer backs a bill that would place limits on a proposed wind farm because it may interfere with NAS Pax River flight testing radar.

Morning Coffee: DoD Contracts Continue Dive

DoD contracts fell 48 percent in February extending a drop that has awards near the lowest level in almost two years,