March 28, 2024

IG Report: P-8A Readiness Rates Drop

P-8A

An evaluation of the readiness of the US Navy’s P-8A Poseidon says the aircraft’s mission capable rates have fallen below the targets set by Naval Air Forces. The May 19 report was released by the DoD’s Office of the Inspector General.